Still screw-in fuses instead of breakers, no residual current device, or too few circuits? We fit a modern distribution board with double RCD protection, usually within a single working day, at a fixed price agreed in advance.
With screw-in fuses instead of breakers, with no residual current device, with a board that is full while another circuit still has to go in, or with visible scorch or melt marks. A pre-1990 board with a single RCD covering everything is also due for replacement.
A board with enough circuits for how you live now, with at least two RCDs so a fault in the garden does not take out the whole house. Every circuit gets a legible label, and you get an overview of what sits where.
We start by measuring and disconnecting, build the new board and reconnect circuit by circuit. The power is off in blocks, not all day. At the end we walk through the board together.
Send a photo of the open fuse box and tell us what you are planning, and you get a fixed price within 24 hours. If it turns out on site that more is needed, for example to the earthing, you hear that first.
Send us your situation with a few photos and you will have a clear quote with a fixed price within 24 hours.
Question not answered here? Call or message us and we will think it through with you, free of charge.
A few hours, spread across the day. We say in advance when, so you can plan around the freezer and working from home.
That depends on what will be connected: cooking, washing machine, dryer, charging point, heat pump. We work it out and leave room for later.
Only if the supply has to be upgraded. Replacing the board itself needs nobody but us.
Then replacing only makes sense once that is sorted. We measure the earthing and say what is needed before we start.
Tell us what needs doing and add a photo, and you will have a fixed price within 24 hours. Available on working days from 08:30 to 17:00, and outside those hours for emergencies.