With three phases you spread the load across three wires instead of one. Needed for power tools, a fast charger or a heat pump. We prepare the fuse box and handle the application with the grid operator.
On a single phase all the current has to go through the same wire, limited by the main fuse. With three phases you spread the load, so cooking, charging and heating do not get in each other's way. A car also charges faster.
Not everyone who thinks they need three phases actually does. We add up what really runs at the same time. Sometimes smart switching or load balancing is enough and you save the cost of an upgrade.
The grid operator upgrades the supply itself; we prepare the fuse box, fit the right board and file the application on your behalf. You do not have to chase it.
We spread the circuits across the three phases so the load is even. An uneven split leads to one phase tripping while the other two do nothing.
Send us your situation with a few photos and you will have a clear quote with a fixed price within 24 hours.
Question not answered here? Call or message us and we will think it through with you, free of charge.
In the meter cupboard you would see three main fuses side by side instead of one. A photo tells us immediately.
The grid operator sets that tariff. We can tell you what our part costs and how the process runs.
Reckon on several weeks to months, depending on how busy the grid operator is. We make sure the fuse box is ready when they arrive.
Not always. With load balancing a charger works fine on one phase, it just charges more slowly. We calculate whether upgrading pays off in your case.
Tell us what needs doing and add a photo, and you will have a fixed price within 24 hours. Available on working days from 08:30 to 17:00, and outside those hours for emergencies.